Changing hosting: plan data and cutover together

Plan the database, files and write access together. A worked sequence separates preparation, cutover and the rollback path once new changes exist.

Lukas Schneider3 min read
Cable connector with pink trim and a top latch, beside a separate socket module.

A hosting change is complete for your team when the agreed workflow runs at the new location with the right data state. Decide in advance when changes will be accepted, who authorises cutover and under which conditions the team can return.

Identify the workflow and its write paths

In the fictional example, a company operates the customer portal P-65. A customer creates request A-65 with attachment F-65. The database and file store belong together. Besides the browser, an interface and a background process can change data. All these write paths must be included in the transition plan.

This example uses an announced pause in writes. That is a deliberate choice, not a requirement for every migration. The team finishes ongoing changes in a controlled way and records which open tasks may continue at the destination. Continuously transferring new changes would be a different method with its own synchronisation and conflict checks.

Agree the cutover as a sequence of work

AWS recommends documenting and rehearsing dependencies, task order, owners, checks and the rollback path before the change. The completed planning template below contains intended steps, not results of a migration that has been performed.

Phase

Agreement in the example

Responsible role

Condition for the next step

Preparation

Check the destination environment with a consistent database and file copy.

Application team

Login and permitted access work, unauthorised access is denied, and the associated file opens in an isolated test.

Write pause

Stop accepting and processing new changes at all old write paths; transfer the final consistent state.

Operations and application team

Open work is recorded; database and files match.

Authorisation

Open the checked destination access point and accept changes only at the intended new write destination.

Business and operations owners

The authoritative data state, access route and stop decision are clear.

Distinguish stopping and returning in advance

Microsoft recommends tailoring stop criteria and rehearsed return steps to the workload. In the example, a missing attachment already prevents authorisation. As long as no new changes have been accepted at the destination, a prepared rollback path to the unchanged old state may be suitable.

After new changes at the destination, resetting the DNS address is insufficient. Those changes may be missing from the old system. Returning then requires a defined authoritative data state and a tested method for the intervening changes. No uncoordinated parallel write paths are opened meanwhile. If the team cannot handle this case safely, it must change the transition plan before authorisation.

Complete DNS and the transition together

The DNS TTL describes normal caching of an answer. Some clients may therefore still use the old access point. Its behaviour must fit the write pause or the new authoritative system; two independently writable copies do not constitute a completed change.

Check the complete workflow in a suitable test environment, including a new request, attachment, roles and background work. External actions remain limited to test destinations there. Also plan monitoring and a responsible contact after authorisation. The old service is retired only once the agreed completion conditions and backup approach have been clarified.

Sources

Written by

  • Lukas SchneiderTechnical EditorLukas Schneider writes about cloud technologies and running applications at ASES. His articles range from choosing infrastructure to maintenance and backups to monitoring live systems.

Follow ASES

Read more

All articles

Cloud & Operations with ASES

Hosting, deployment, maintenance and support